Installation Of Road Crossing Duct Banks By Open Cut Or Directional Drilling/Thrust Boring Methods, Crossing Of Existing Utilities. Demarcation, Excavation Of Trenches, Precast Concrete Trough Installation, Dune Sanding, Cable Laying (Power, Pilot & F.0.) Installation Of Straight Through Joints And Indoor/Outdoor Termination Works (Upto 33 Kv & Pilot Cables)